Was your shipment already in transit?
The controlling Notice uses two strict timing tests: final-mode loading must be before the first cutoff, and entry or warehouse withdrawal for consumption must be before the second cutoff. Missing timestamps or evidence should produce a needs-docs result, not a guess.
Loading cutoff
2026-07-24 00:01:00-04:00
Entry cutoff
2026-07-28 00:01:00-04:00
Enter both timestamps to evaluate the exception.